NEWS
CETC NEW ENERGY
Sprint into the second quarter, maximize the "struggle value" (Part One)
2025-06-09
On May 30th, a copper purification device was successfully delivered to a customer site in Shaoguan. This device effectively removes oxygen elements from copper materials, features a high degree of automation, low maintenance costs, effectively reduces production costs, and improves production efficiency and economic benefits.



On June 6th, the company's self-developed horizontal high-temperature purification equipment was shipped to a key materials enterprise in Heilongjiang. This is the customer's repeat purchase of the company's core equipment following their first cooperation in 2023. The equipment adopts multiple innovative technologies, equipped with an intelligent temperature control system, achieving ±1°C precise temperature control through the linkage of resistance gradient heating and infrared thermometers; it integrates automated process modules, supports multi-stage purification program presets, and features one-button start-stop intelligent operation; the innovative chamber flow field design, combined with gas distribution devices, ensures material purity can reach over 99.999%.
On June 9th, 210 customized purified graphite products for customers in Shandong and Anhui were successfully shipped. As of now, over 80,000 purification products have been shipped cumulatively for 2025.
Author / Xi Jin'an
Proofreader / Shi Yujie
Editor / Nie Chunyan
Keywords:
RELATED INFORMATION
Theme Party Day Activity: Tracing the Red Footsteps, Uniting to Forge a Forward-Moving Force
2026-10-31
I’m on duty for National Day—practical action shows responsibility.
2026-10-01
2026-09-30