NEWS
CETC NEW ENERGY
Delivery ing gusto, struggling to sprint for the second quarter!
2024-06-20
On June 20, a vertical high-temperature purification equipment was successfully sent to Sichuan customer site! The equipment increases the effective working area to increase the material loading capacity; its vacuum system consists of a screw pump group and an oil diffusion pump dual system, which not only ensures the ultimate vacuum of the equipment to reach 0.05Pa, but also shortens the pumping time; the strong cooling system has a low temperature and rapid cooling function, which greatly improves the production efficiency of the equipment.
June 20, Shanghai, Shanxi, a customer customized purified graphite products have been successfully shipped. Up to now, about 135000 pieces of purified products have been shipped in 2024.

Keywords:
RELATED INFORMATION
Theme Party Day Activity: Tracing the Red Footsteps, Uniting to Forge a Forward-Moving Force
2026-10-31
I’m on duty for National Day—practical action shows responsibility.
2026-10-01
2026-09-30